Please note that we are on company holidays from 21.12.2024 to 01.01.2025. We will be fully available until 20 December at 15:00 (rush orders until 18 December at the latest). We will be back fresh and motivated from 2 January 2025 ;)    +++    Please note that we are on company holidays from 21.12.2024 to 01.01.2025. We will be fully available until 20 December at 15:00 (rush orders until 18 December at the latest). We will be back fresh and motivated from 2 January 2025 ;)    +++    Please note that we are on company holidays from 21.12.2024 to 01.01.2025. We will be fully available until 20 December at 15:00 (rush orders until 18 December at the latest). We will be back fresh and motivated from 2 January 2025 ;)

bachmaier builds.

We are building a new company building with a special flair! In the industrial area Pfaffenfeld II in Bischofswiesen (10 km away from our current location) an exposed concrete building with many wood and glass elements is being built. Modern architecture that harmonizes perfectly with the surrounding landscape and mountains. We are looking forward to unite all our divisions under one roof!

Special features

Climate neutrality

We rely on an environmentally friendly energy supply. Our groundwater heat pump meets the highest standards for low-energy buildings and achieves an optimal energy balance.

Climate neutrality

We rely on an environmentally friendly energy supply. Our groundwater heat pump meets the highest standards for low-energy buildings and achieves an optimal energy balance.

Photovoltaics

Electricity from solar power rounds off the climate-neutral energy supply by ensuring us emission-free power generation.

Photovoltaics

Electricity from solar power rounds off the climate-neutral energy supply by ensuring us emission-free power generation.

Heat

A central ventilation system supplies all rooms with fresh air. A heat exchanger converts the waste heat from the building and technical systems into heating energy. The groundwater heat pump supports the cooling of the building at hot temperatures. The building has a very high thermal insulation due to the concrete construction and insulation, which improves the efficiency of the heat pump.

Heat

A central ventilation system supplies all rooms with fresh air. A heat exchanger converts the waste heat from the building and technical systems into heating energy. The groundwater heat pump supports the cooling of the building at hot temperatures. The building has a very high thermal insulation due to the concrete construction and insulation, which improves the efficiency of the heat pump.

Charging system

There will be 10 company-owned e-charging stations where our electric cars will be charged with 100% solar power.

Charging system

There will be 10 company-owned e-charging stations where our electric cars will be charged with 100% solar power.

LED

Efficient lighting systems let the building shine in the right light from the outside and inside. Daylight lamps provide balanced light at the workplace even on dull days.

LED

Efficient lighting systems let the building shine in the right light from the outside and inside. Daylight lamps provide balanced light at the workplace even on dull days.

Habitat

Valuable green spaces for well-being are created around the building. A garden extends the social area, trees and shrubs contribute to a natural atmosphere throughout the property. We respect the habitat of our property inhabitants - bats, butterflies and sand lizards.

Habitat

Valuable green spaces for well-being are created around the building. A garden extends the social area, trees and shrubs contribute to a natural atmosphere throughout the property. We respect the habitat of our property inhabitants - bats, butterflies and sand lizards.

The plan

Spatenstich

On an area of 1677 m2 distributed over two floors, four large areas are created, which are accessible via the bright central foyer. Special attention is paid to the flexible design of the social area on the first floor, which allows meeting and exchange through an open space concept. On the one hand, it is a classic lounge with kitchen and coffee bar, on the other hand, it serves as the main communication area for meetings, training sessions, customer discussions and many other occasions. In the warehouse opposite, a well thought-out shelving system and a packaging and shipping line ensure smooth logistics processes.

Spatenstich

The upper floor with 811 m2 offers plenty of space for administration and a production according to the latest standards. Large windows with a unique view of the mountain panorama enrich the ergonomically designed office and production workplaces. The open space concept offers room for individual requirements. Special features, such as freedom from dust in the raw material area or perfect room acoustics for video conferencing, are solved with a well thought-out room-in-room concept.

1677

m2 Net floor space

684

m3 Concrete

118

2Tons of structural steel

556

m2 Glass

365

2Solar panels

Baufortschritt Pfaffenfeld, Oktober 2022

Inauguration party

Construction diary // October 29, 2022

After about a year of construction, we were able to celebrate the official inauguration of our new company building in Bischofswiesen this weekend together with all employees and their families. After a tour of the premises, an emotional speech and vote of thanks, all guests gathered at the bachmaier Café for dinner. Interesting conversations at the cocktail bar and dancing to good music rounded off the unforgettable evening. We are still overwhelmed and grateful to have gathered so many great people around us and toasted the future together.

Baufortschritt Pfaffenfeld, September 2022

The new bachmaier® warehouse is ready.

Construction diary // September 23, 2022

Unbelievable how fast the move of the warehouse to Pfaffenfeld took place. We planned with three days for the move and finally, due to the many helping hands, we managed everything in two days. The transition from Ramsau to Bischofswiesen went smoothly, so that our team was able to continue working seamlessly at the new location. On Friday, the goods were shipped from Ramsau and already on Monday, the shipment from Bischofswiesen started. On almost 400 sqm of storage space, our well thought-out shelving system as well as our new packaging and shipping line ensure smooth processes.

Baufortschritt Pfaffenfeld, September 2022

Mission "solar power" successful!

Construction diary // September 14, 2022

What an exciting moment when the 264 photovoltaic panels finally converted the first rays of sunlight into electricity after almost a week of installation. The 1200 square meters of flat roof were completed by the Eschrich company in April and now covered with a layer of native pebbles from the Saalach river. The gravel provides UV protection for the underlying waterproofing, serves as an insulating layer and weighs down the stud frame of our photovoltaic system. We are overjoyed about this environmentally and climate-friendly solution with which we now cover a large part of our energy needs.

Baufortschritt Pfaffenfeld, August 2022

The kitchen – the heart of the house.

Construction diary // August 22, 2022

We have put a lot of time and energy into our bachmaier Café project. Because this area is not just a place to eat, but much more a place where we spend time together, cook and enjoy together, talk to each other, laugh heartily and celebrate. Until our kitchen is filled with life, we still have to be a little patient ...

Baufortschritt Pfaffenfeld, August 2022

And already you have a whole new look.

Construction diary // August 9, 2022

The floor immediately gives the room a special feeling of well-being. The choice of the floor was not the easiest decision. Because not only the appearance, but also the requirements, such as sound insulation, step and slip resistance, easy cleaning and low odor played an essential role in the selection.

Baufortschritt Pfaffenfeld, Juli 2022

Work is being done on all fronts.

Construction diary // July 20, 2022

On the construction site, people are digging, drilling, screwing, sawing ... there's a veritable fireworks of sound for the ears here. Our hard-working helpers have their hands full in and around our new building.

Baufortschritt Pfaffenfeld, July 2022

Our offices are taking shape.

Construction diary // July 7, 2022

What appears to be a barren wooden skeleton here will soon be used as a meeting room. The individual rooms in the middle of our office area are designed to provide the ideal environment for personal consultations, workshops and video conferences. Our material concept of concrete, wood, glass and steel continues in the interior design. The wooden stud walls made of local larch ensure perfect acoustics, optimal sound insulation and thus contribute to the feel-good climate.

Baufortschritt Pfaffenfeld, June 2022

Efficient heating from the ground up.

Construction diary // June 9, 2022

For our new building, we use groundwater heat as a heat source. Heating with a groundwater heat pump is not only particularly energy-efficient and powerful, but also makes us independent of fossil fuels. Our well drilling was carried out in pouring rain. For this, we went 25 meters deep into the ground.

Baufortschritt Pfaffenfeld, May 2022

FINALLY topping-out ceremony!

Construction diary // May 16, 2022

Knapp 10 Monate nach dem Spatenstich ist der Rohbau fertig. Mit 100 Gästen feierten wir zünftig den ersten großen Abschnitt unseres Neubaus. bachmaier® dankt allen Bauarbeitern und ausführenden Gewerken, die bisher am Bau beteiligt waren, für die gute Zusammenarbeit.

Baufortschritt Pfaffenfeld, April 2022

Pane by pane

Construction diary // April 20, 2022

In the future, 255 square meters of solid wood windows made of native larch will ensure a pleasant indoor climate in our new building. Wood as a natural and renewable raw material stands for coziness and naturalness and convinces with a very good heat and sound insulation. The generous glass fronts ensure sufficient natural light for our new workplaces. We can hardly wait!

Baufortschritt Pfaffenfeld, März 2022

Wrapping art at bachmaier®

Construction diary // March 15, 2022

Currently, a massive scaffolding made of countless steel rods covers the facade of the new bachmaier® building. What looks like abstract art here serves as a support for our canopy panels weighing up to 4 tons. Despite freezing cold with temperatures down to -14 degrees, we are making good progress with the construction project, only the roof is still missing from the shell.

Baufortschritt Pfaffenfeld, Januar 2022

The ease of construction

Construction diary // January 19, 2022

Lightly and gracefully, the 54-ton truck-mounted crane moves one precast concrete part after the other to its designated place. The last precast concrete elements of a total of 154 are being erected today. The upper floor is now in place and we are slowly approaching the 8-meter total height of the new bachmaier® building. Our company location in Bischofswiesen continues to take shape.

Baufortschritt Pfaffenfeld, Dezember 2021

Brightly lit ...

Construction diary // December 3, 2021

You can see it from afar: The bachmaier® Christmas tree shines in front of our construction site at the new company location and creates a Christmas atmosphere for the employees of our construction partners, for our future neighbors and for us. We can hardly wait to move into the new building and are looking ahead to 2022 with big plans.

Happy Christmas and a Happy New Year wishes the entire bachmaier® team.

Baufortschritt Pfaffenfeld, November 2021

True heavyweights...

Construction diary // November 29, 2021

The new bachmaier® building in Bischofswiesen is growing rapidly. Before winter arrived with the first snow in the Berchtesgadener Land region, the assembly team of the Salzburger Fertigteilwerk from Salzburg Bergheim put in a full effort on our construction site. What looks so easy is heavy-duty work with millimeter precision - a perfect interplay of man and machine.

Construction progress Pfaffenfeld, October 2021

A good base...

Construction diary // October 6, 2021

The progress in the Pfaffenfeld cannot be overlooked. The Neubauer company from Bad Reichenhall is currently preparing the foundations for the exposed concrete walls. The formwork is being erected and ironworkers are adjusting the reinforcement before the concrete mixer arrives and the concrete is poured.

The earthworks begin

Digged, ready, go!

Construction diary // September 2, 2021

The earthworks begin, starting with excavators, trucks & co. It remains exciting and we are in good spirits, even if very much work ahead. ;)

Pfaffenfeld groundbreaking

Pfaffenfeld groundbreaking

Construction diary // July 26, 2021

At dizzy heights: together with planner and site manager Matthias Schulmayr, Katharina Irlinger and Fabian Kubicke gave the official go-ahead for construction work on the building site in the Pfaffenfeld II industrial estate in Bischofswiesen on July 26, 2021.

The construction site

All is still quiet...

Construction diary // July 19, 2021

Only our construction banner has already found its way onto the construction site....
But that will change soon, because soon excavator & Co. will move in.

Hike and employee party

Let's go!

Construction diary // July 15, 2021

Hike and employee party "From Reichlfeld to Pfaffenfeld" - full of anticipation, we decided to set off on foot with our colleagues from the old to the new site. Cross-country, uphill and downhill, over steep slopes, meadows and rocks. Together we braved wind and weather and had a lot of fun with good food ;) Arrived at the destination, there was a well-deserved barbecue party.

Fantastic place to work

Building site and location